Ensuring a clean, reliable water supply

Water Resources

Access to a clean, reliable water supply is an essential part of a thriving community. Our Water Resource engineers make this a reality with their expertise in designing and developing efficient methods to bring safe water in, direct wastewater out, and create plans to avoid damaging flooding.
  • Drainage
  • Natural Channel Design
  • Hydrologic Studies / Designs / Analysis
  • Wastewater Engineering
  • Water Supply Engineering
  • FEMA Map Revisions
  • Water Quality Analysis & Planning
  • Environmental Constraints and Alternative Analysis
  • Flood Control
  • Localized Storm Drain Improvements
  • Major Water Transmission Main Design
  • Wastewater Interceptor Design
  • Watershed Management
  • Water Quality Treatment Facility Design
  • Erosion Control and Stream Bank Stabilization
  • Floodplain Management and Delineation
  • Hydraulic Design / Analysis
  • Stormwater Management
  • Water Pollution Abatement
  • Conventional & Innovative Storm Water Management Facilities
  • Water Resources Planning
  • Environmental Impact Assessments

Water Resources

Projects

Browse various projects that fall within this division

Bella Fortuna

Austin, TX

Bella Fortuna is a 157-acre residential subdivision located about a mile southeast of I-35 and Onion Creek Parkway along Bradshaw Road in the city of Austin's extraterritorial jurisdiction. Bella Fortuna includes the construction of 530 single-family home sites in five phases, a 3-acre commercial site, and 46 acres of parkland with a 1.5-mile trail network connected to the Onion Creek regional trail plan. As project manager and senior civil engineer Davood is overseeing the entire design and permitting for Bella Fortuna. The project includes a Public Improvement District, or PID with additional community benefits which were unanimously approved by the Travis County commissioners Court per a set of two agreements with the new landowner, Brohn Homes. The public improvements include water quality and detention ponds that meet the county’s updated floodplain standards; approximately 6,100 linear feet of wastewater main with wastewater service provided by Austin Water Utility; a 2,400-foot collector road called Bella Fortuna Drive running east-to-west, providing a future connection to Pleasant Valley Road and the I-35 frontage road; and two neighborhood parks and approximately 10,600 feet of hike-and-bike trails that will be open to the public. In addition to the PID improvements, Bella Fortuna includes subdivision roadways and all other infrastructure required for this subdivision. Davood is supervising the entire design and permitting process of this project. Phase 1 and Phase 2 plats have been recorded. The project team is currently working on the plating of future phases. Phase 1 construction was completed just recently and phase 2 construction is scheduled to begin in the Spring of 2021.

Learn More

Blue Hole Primary - Wimberley One Water School

Built to be "the first One Water school in Texas", Wimberley Independent School District’s newest campus—Blue Hole Primary—was designed and constructed with strong support from Texas State’s Meadows Center for Water and the Environment, the Wimberley Valley Watershed Association, and a community of stakeholders, educators, architects and engineers.

Learn More

Dam Engineering: SC Robertson Dam and DeCordova Dam

Thornton, TX and Granbury, TX

SC Robertson Dam (Lake Limestone) and DeCordova Bend Dam (Lake Granbury) Breach Analyses and Inundation Mappings The Brazos River Authority (BRA) owns, operates and maintains a series of dams along the Brazos River. The dams have high-hazard classifications because of the consequences of dam failures, and because their sizes and hazard ratings are subject to State Dam Safety criteria. One of the dam safety criteria is that high-hazard dams must have written Emergency Action Plans with detailed supplemental breach inundation mappings. The BRA hired a preeminent hydrologic & hydraulic engineering firm to prepare the complicated breach analyses (using HEC-RAS hydraulic modeling) and detailed breach flood inundation mappings for S.C. Robertson Dam (Lake Limestone) and DeCordova Bend Dam (Lake Granbury) for “sunny-day” breach failure conditions and for Probable Maximum Flood (PMF) design flood conditions. S.C. Robertson Dam has a 8,130 foot-long embankment section with a maximum fill height of 60 feet, a concrete gravity spillway with 5 radial gates and a stilling basin. DeCordova Bend Dam has a 1,400 foot-long compacted fill embankment section with a maximum fill height of 63 feet, a concrete Ambursen-type spillway with 16 radial gates and a stilling basin. Breach analyses and breach flood inundation mappings were performed using HEC-RAS hydraulic program. Doucet calculated the breach parameters for both dams, the embankment sections, the gated spillway sections, the “sunny-day,” and for PMF design flood hydraulic conditions. Doucet performed data research of the configurations of the two dams, including reviews of the construction as-built drawings and performed site visits to confirm field conditions and to confirm the locations and types of reasonable breach scenarios.

Learn More

Dam Engineering: Scenic Brook Flood Control Project

Austin, TX

Scenic Brook Flood Control Project, Hydrologic Modeling & Dam Hazard Analysis The Scenic Brook neighborhood is located on the Scenic Brook Tributary to Williamson Creek in the City of Austin. The neighborhood has been plagued by frequent local flooding. The City hired a team to develop mitigation measures. As part of the solution, the team identified a stormwater detention pond up gradient from South Brook Drive to reduce peak flowrates entering the neighborhood. Doucet provided the following: Developed the SCS TR-20 model for the existing and future condition for the 2-, 5-, 10-, 25-, and 100-year storms Coordinated with TCEQ staff on dam safety requirements. Coordinated with staff in adjusting detention pond outlet structures to meet flood control objectives and TCEQ requirements. The detention pond consisted of a concrete retaining wall embankment, and is approximately 16’ high with a flood storage volume of about 22 acre-feet. Developed dam safety analysis using the Probable Maximum Flood (PMF) storm event Prepared engineering report documenting the project approach and conclusions.

Learn More

Deep Eddy Distillery

Dripping Springs, TX

Deep Eddy Vodka Distillery is a 20,000 SF project located on 4 acres in Dripping Springs. The project included the development of a distillery with a 5000 SF tasting room. The entire site expands to 30,000 SF for outside seating and events.

Learn More

Floodplain Management: Bull Creek Watershed

Austin, TX

Bull Creek Watershed Floodplain Modeling and Mapping The Bull Creek Watershed, including West Bull Creek, is a suburban watershed with approximately 31.5 square miles of drainage area and 34.25 stream miles to be studied. The main purpose of this project was to develop digital geo-referenced hydrologic and hydraulic models and floodplain maps for the Bull and West Bull Creek watersheds for both existing and fully-developed land-use conditions. Our responsibility for this project involved developing hydraulic data and floodplain mapping for selected tributaries of Bull Creek. Doucet developed: Fully-annotated HEC-RAS models with all supportive GIS files such as cross-sections and GIS geodatabase for both existing and fully-developed land-use conditions Digital hydraulic data including tables, methodology descriptions and exhibits for Existing and Fully-Developed Land-use Conditions to incorporate into the Hydraulic Technical Support Data Notebooks (TSDN), Water surface elevation profiles at similar vertical and horizontal scale as the profiles in the effective FIS report for selected FEMA flood frequencies using RAS-PLOT for the detailed study tributaries only, Floodplain mapping Digital copies of the floodplains and BFEs for the detailed study tributaries for both existing and fully-developed land-use conditions

Learn More

Floodplain Management: Crystal Brook Flood Control

Austin, TX

Over 175 homes located in the Crystal Brook neighborhood were threatened by frequent flooding due to floor elevations below the 100-year storm water surface elevations. Doucet provided the following improvements: 16,600 LF of storm sewer lines (ranging from 18” RCP to 12’ x 7’ concrete box) 7,000 LF of channel improvements (ranging from 6’ wide to 100’ wide bottom) 5,700 ft. flood barrier system 2,000 LFof creek bank stabilization and restoration

Learn More

Floodplain Management: Los Indios Culvert

Austin, TX

Los Indios Culvert Upgrade and Channel Improvements The Los Indios subdivision and Los Indios Trail are located in northwest Austin. The Los Indios Trail roadway was overtopped by Rattan Creek during the 10-year and greater return period storm events putting seven (7) homes in the vicinity of Los Indios Trail at risk of flooding in the 100-year storm event. Using on-the-ground topographic survey, Doucet developed alternatives to mitigate the culvert and local flooding problems and prepared construction plans for the proposed improvements.

Learn More

Floodplain Management: Oak Lawn Storm Drain Improvement

Austin, TX

Doucet performed a hydrologic and hydraulic study of the existing storm drain network in the lower Fort Branch Oak Lawn Subdivision area bounded by Springdale, Heflin, Webberville, and Ribecke roads. This area was identified as having localized flooding problems through the Fort Branch Watershed Integrated Solutions Study. As a result, new storm drain systems were designed to supplement the existing systems. The final design encompassed approximately 5,500 LF of storm drain pipe and 2,000 LF of water main.

Learn More

George Washington Carver Museum

Austin, TX

Doucet designed the grading, drainage, parking, and water and wastewater facilities for the George Washington Carver Museum and Library expansion project. The museum itself encompasses 30,000 SF and the library addition is 15,000 SF. Major elements of the job included designing a storm water detention facility and relocating 500 LF of the city's 24-inch water transmission main to facilitate placement of the new museum. Doucet designed all specifications to adhere to the City of Austin's environmental sustainability building program. In addition, our staff also looked into options to obtain LEED credits for storm water and existing pavement material re-use. Other issues Doucet encountered included inserting a stopping valve into the existing 24-inch line because of faulty valving on the existing system. Doucet successfully coordinated with the city's water and wastewater department and the contractor to install the stopping valve.

Learn More

Stream Restoration/Assessments: ACWP Country Club Creek Stabilization

Austin, TX

Over 100 linear feet of existing 36” diameter concrete wastewater line lost the cover and backfill due to scour and downcutting of Country Club Creek just upstream of Grove Boulevard. The line was downstream of the Austin Community College Riverside Campus and many apartment complexes. The exposed line was vulnerable to being deflected with opening pipe joints and wastewater spills if not stabilized. We designed a stabilized riffle downstream of the problem area to stable upstream environment for the new backfill around the exposed wastewater line. To stabilize the exposed wastewater line, an external gasket was used at each joint. The final design included normal bedding for the pipeline to the haunch, rock ballast to the top of the pipe and top it off with 12” diameter rock riprap.

Learn More

Stream Restoration/Assessments: City of Austin Watershed Erosion Assessments

Austin, TX

Most of the Austin’s watersheds, including urban and suburban watersheds, are drained by streams that exhibit existing creek bank erosion problems and have the potential for future creek bank degradation. The concern for future creek bank failures, long term channel degradation, and their impact to creekside residents and water quality initiated the City of Austin Drainage Utility Department to authorize the city wide watershed erosion assessments in January 1997. The 17 watersheds are as follows: Barton Creek Watershed Blunn Creek Watershed Boggy Creek Watershed Bull Creek Watershed Buttermilk Creek Watershed Country Club Creek Watershed East Bouldin Creek Watershed Fort Branch of Boggy Creek Watershed Johnson Creek Watershed Little Walnut Creek Watershed Shoal Creek Watershed Tannehill Branch of Boggy Creek Watershed Waller Creek Watershed West Bouldin Creek Watershed Walnut Creek Watershed Williamson Creek Watershed

Learn More

Stream Restoration/Assessments: Erosion Control Projects at Bartholomew Park

Austin, TX

Doucet prepared “natural channel” design which incorporated floodplain creation and bioengineering to maintain bed load transport and flow conveyance in a stable channel system.

Learn More

Stream Restoration/Assessments: Erosion Control at Givens Park

Austin, TX

Doucet stabilized the stream banks and maintained bed load transport. Different techniques such as geogrid, large boulders, erosion fabrics, and bioengineering were employed to manage the channel erosion while creating a natural channel appearance.

Learn More

Stream Restoration/Assessments: Shoal Creek Greenbelt Trail and Bank Stabilization

Austin, TX

The Shoal Creek hike and bike trail experienced erosion problems in the lower reaches of Shoal Creek, often completely washing the trail out at some locations along the top of the channel banks. The project designed solutions for nine separate erosion locations along Shoal Creek in the area from 6th Street to 29th street. Nine areas were selected for improvements and were developed using varying techniques such as limestone boulders with geogrid for stability, erosion matting, permeable concrete for trails, and bioengineering were employed to manage erosion of the trails while creating a natural appearance for the channel.

Learn More

Stream Restoration/Assessments: Southern Walnut Creek Trail Improvements

Austin, TX

Construction of 7.3 miles of Southern Walnut Creek Bike Trail. The trail is aligned close to the Walnut Creek and Boggy Creek channels where ongoing channel instability and erosion could undermine the new trail. CPE designed Walnut Creek and Boggy Creek channel stabilization measures at four locations, emphasizing the use of green channel stabilization measures, rather than traditional “hard” measures, including 520 CY of gabions, 1,800 SY of soil retention blanket, 3,400 SY of geogrids, 2,840 CY of rock riprap, and 220 CY of large limestone blocks.

Learn More

Stream Restoration/Assessments: Waller Creek District Master Plan

Austin, TX

Doucet assisted in the development of a master plan within the Waller Creek corridor the Waller Creek District. The master plan’s project area was generally bound by: 12th Street on the north; Interstate Highway 35 on the east; Lady Bird Lake on the south; and Red River street and Trinity Street on the west. One goal of this project was to provide strategies and costs for the restoration of eroded and otherwise degraded sections of Waller Creek stream banks within the study area. Doucet was responsible for budget estimates for all of the creek corridor improvements. Improvements included adding trails, stairs, ramps, terraces, overlooks, path lighting and the removal of obstructions and dams. Doucet also presented the Creek Corridor Comparable Projects Report and Budget Estimate to City of Austin staff and the Technical Advisory Group for their review and comment. Doucet also performed field reconnaissance visits to confirm existing conditions and to identify locations and to make measurements of stream channel improvements.

Learn More

Stream Restoration/Assessments: Whitaker Field at Waller Creek

Austin, TX

Whitaker Field at Waller Creek Stream Bank Stabilization Doucet provided bank stabilization services for three of the most severely eroded areas along the west bank of Waller Creek within the University of Texas Whitaker Field property boundary as well as preparation of a Master Erosion Plan for the Waller Creek along Whitaker Field. The existing Waller Creek was characterized by bank erosion, channel bottom down cutting, fallen tree trunks and limbs, significant amount of debris, significant amount of trees, and frequent wastewater line crossings. The University of Texas was losing property and the eroded bank was a potential safety hazard for the athletic field users. To correct this, Doucet used stabilization techniques for the three most severely eroded areas that included placing limestone blocks, selected soil backfill, soil retention blankets and 2’ diameter rock riprap at the problem areas. The City’s Austin Clean Water Program (ACWP) has a wastewater improvement project along a portion of the study area. Doucet coordinated with the ACWP director and project engineer to insure a seamless transition between the two projects. Towards this goal, Doucet assisted the project engineer in creating a Master Erosion Plan which included reviewing of peak discharges, channel velocities and shear, as well as identifying additional bank stabilization areas and locations of grade control structures. The Master Erosion Plan was presented to the representatives from the UT Athletic Department and was well received.

Learn More

Water Quality: City of Georgetown

Georgetown, TX

Downtown Overlay District (DOD), Water Quality Master Plan and Regional Water Quality Pond Design The City of Georgetown developed a downtown master plan to provide a comprehensive development strategy for the central part of the City. The master plan boundary followed that of the Downtown Overlay District (DOD). The DOD, comprised of approximately 110 acres, consisted of varied land uses including commercial, institutional, and residential. As part of the downtown master plan and to provide a more holistic approach toward re-development within the DOD, the City investigated a “regional” approach to providing storm water quality management. Utilizing such an approach eliminated the need for individual water quality ponds on each re-developing parcel, allowing more flexibility in design and providing a more aesthetically pleasing framework for this historic area of the city.

Learn More

Water Quality: La Frontera Center Water Quality & Wet Pond

Round Rock, TX

The La Frontera Section I and II development (a 113-acre commercial retail center) is located at the Northwest corner of IH-35 and FM 1325 in Round Rock, Texas. Doucet designed a regional stormwater detention facility to protect downstream properties (structures within the floodplain), and a stormwater quality treatment facility to protect the northern Edwards’ Aquifer. In addition, three downstream road crossings were sub-standard and did not allow for safe passage in a 25-year storm event. Doucet performed a hydrologic analysis on this tributary of Lake Creek and designed culvert improvements for the three road crossings.

Learn More

Water Quality: Town Lake Park Wet Pond

Austin, TX

The Town Lake Park water quality wet pond is located in the northwest quadrant of the Palmer Events Center. The pond collects, treats, and detains stormwater runoff from approximately 18.3 acres of the site which includes the following areas: Palmer Community Events Center building (rooftop runoff), parking garage, parking and drive area near the Doherty Arts Center, the children’s outdoor arts center, the open meadow inside the large oval sidewalk, and the area in the immediate vicinity of the pond.

Learn More

What could your business accomplish with Doucet?

Let's Find Out

Your browser is out of date!

We noticed you are currently using an old version of Explorer.
To view this website, we recommend you update your browser.